FRC Infrastructure Project

Purfleet Port Entrance Slab Construction

The CLDN Cobelfret infrastructure project comprised the construction of a new heavy-duty entrance layout to the Purfleet Port. The development started in June 2023 and completed successfully in May 2024. Working for main contractor ISC Contracting, KYN Services delivered the full FRC (Frame, Reinforcement, Concrete) works.

Scope of Works: Groundwork base preparation, steel reinforcement layout fixing, formwork shuttering installation, and placing and finishing high-strength concrete to meet port haulage specifications.

Project Gallery

Project Facts

  • Main Contractor ISC Contracting
  • Location Purfleet Port
  • Timeline Jun 2023 - May 2024
  • Scope RC Entrance Slab package
  • Status Completed